Payback period
Annual revenue
DISCLAIMER: This Red E Charging LLC (“Red E”) Site Evaluation Tool provides preliminary estimates for general informational purposes only and does not constitute financial, investment, tax, accounting, or legal advice. The outputs are projections generated from the site inputs provided and from Red E’s modeling assumptions, including but not limited to costs & profits based on site location, annual increases in charging sessions, 40 kWh per charging session, zero energy loss from grid to vehicle, zero non-EV session energy use, flat utility and driver $/kWh rates over a 10-year horizon, 365 operating days per year, no equipment or operating tax, no costs such as lease fees for hosting the charging equipment, & does not include any operating costs beyond modeled electricity costs and Red E’s software fee. The outputs are indicative only, are not guarantees, predictions, or commitments, and Red E makes no guarantee of profitability. Actual results may differ materially.
Red E makes no representations or warranties of any kind, express or implied, regarding the completeness, accuracy, reliability, suitability, or availability of the assessment or any information, products, services, or graphics it contains for any purpose. Any reliance you place on the assessment is strictly at your own risk. To the fullest extent permitted by law, in no event will Red E be liable for any loss or damage, including without limitation indirect, incidental, special, or consequential loss or damage, or any loss of data or profits, arising out of or in connection with the use of this assessment.
Start Your Red E Site Evaluation


RED E CHARGE